This section describes a test study carried out [15] on the multi-level alternatives for possible use in HVDC transmission. The scheme ratings for the comparison were 300 MW, 150 kV, which at the time of the study represented the limit of the market for VSC power transmission technology.

Preliminary considerations, both practical and economical, led to the exclusion of multilevel topologies with more than four levels for the 300 MW power rating. The alternativeconfigurations considered were two-level, three-level diode-clamped and four-level floating capacitor converters. The switching frequencies for each of the three converter models used in the study were selected to achieve a harmonic performance equivalent to that of a twolevel converter switching at 1050 Hz. This frequency was chosen as a compromise between two limiting factors. At higher switching frequencies, the switching losses become more significant, whereas converters operating at low frequencies require the use of larger, more expensive DC capacitors and AC filters. For each topology the issues analysed were the capital costs, capitalised losses, DC capacitor volume, commutation inductances and the footprint of the converter station.

Using as a reference the costs of the two-level converter (defined as one per unit),Figure 6.21 shows the cost comparison of the three alternative schemes. The different duties of the semiconductor devices in the three topologies have been taken into account in the evaluation of the total capital cost. In the two- and three-level topologies the higher switching losses associated with the higher switching frequency for each device reduce the current capability of the semiconductor, thus requiring higher rated devices. Despite this fact, the figure shows that the two-level converter requires lower capital cost than the other two alternatives.

However, the capitalisation (at 3000 euros/kW) of the switching power losses makes the two-level scheme the most costly of the three. In fact capitalisation of losses makes the four-level floating capacitor the most economical solution. However, if the value placed on the loss capitalisation is reduced to 1000 euros/kW the three topologies yield practically the same total cost.

This section describes a test study carried out [15] on the multi-level alternatives for possible use in HVDC transmission. The scheme ratings for the comparison were 300 MW, 150 kV, which at the time of the study represented the limit of the market for VSC power transmission technology.

Preliminary considerations, both practical and economical, led to the exclusion of multilevel topologies with more than four levels for the 300 MW power rating. The alternativeconfigurations considered were two-level, three-level diode-clamped and four-level floating capacitor converters. The switching frequencies for each of the three converter models used in the study were selected to achieve a harmonic performance equivalent to that of a twolevel converter switching at 1050 Hz. This frequency was chosen as a compromise between two limiting factors. At higher switching frequencies, the switching losses become more significant, whereas converters operating at low frequencies require the use of larger, more expensive DC capacitors and AC filters. For each topology the issues analysed were the capital costs, capitalised losses, DC capacitor volume, commutation inductances and the footprint of the converter station.

Using as a reference the costs of the two-level converter (defined as one per unit),Figure 6.21 shows the cost comparison of the three alternative schemes. The different duties of the semiconductor devices in the three topologies have been taken into account in the evaluation of the total capital cost. In the two- and three-level topologies the higher switching losses associated with the higher switching frequency for each device reduce the current capability of the semiconductor, thus requiring higher rated devices. Despite this fact, the figure shows that the two-level converter requires lower capital cost than the other two alternatives.

However, the capitalisation (at 3000 euros/kW) of the switching power losses makes the two-level scheme the most costly of the three. In fact capitalisation of losses makes the four-level floating capacitor the most economical solution. However, if the value placed on the loss capitalisation is reduced to 1000 euros/kW the three topologies yield practically the same total cost.